How to Get to Taikoo Hui

Address: 383 Tianhe Road, Guangzhou Opening hours: 10am to 10pm

Car: access to main roads of Tianhe Dist. Metro: connected to Metro Line 3
Taxi: waiting area at north entrance Bus: connected to BRT Station

Follow Us

Follow us on Sina Weibo

@太古汇TaiKooHui-广州

Follow us on WeChat

TaikooHui-Guangzhou

  • CN

Home >Working >Specification

Office Specification — Tower 1

Area
Number of storeys 39
Number of office floors 34
Total gross office floor area Over 160,000 sqm
Lift
Provision for internal staircases Available
Hitachi Passenger lifts 22 in 3 zones
Hitachi Dedicated Service lifts 2
Typical Floor
Curtain wall to core wall depth 12.4 – 13.1 m
Raised floor 150 mm (Clear void: 100 mm)
Clear headroom 2.82 m
Clear headroom of feature floors 3.62 m
Loading 3 kPa
Loading around core wall
7.5 kPa
  • Electrical
    Normal power 80 VA
    ABB HV / LV switchboards and power transformers
    Emergency power Mitsubishi diesel back up generators with BMS monitoring - supporting critical facilities
    Schneider / Siemens power 30 VA
    Designed occupancy density of 9 sqm per person
  • Air-Conditioning
    Overhead Variable Air Volume (VAV) air-conditioning system
    CO2 sensors to optimize indoor air quality
    2 York air handling units per office floor
    Dual chilled water risers standby chillers backup
    Infrastracture managed by Swire Properties
  • Telecommunications
    Dual feed, full CAT6 and fibre optic cabling specification
    Trunking for tenants' own data cables between floors
    Free choice of FTNS operators
    Cable TV ready
  • Properties Management and Security
    Properties management by Swire Properties who has over 35 year's properties development and management experiences
    24-hour centralised control room with state-of-the-art monitoring and client helpline
    Advanced car park vehicle locating system together with CO2 sensors to monitor car park air quality
    Honeywell security access card control system
    Johnson Controls Building Management System
    Covered drop off areas and managed taxi stands
    Dedicated / separate delivery entrances and loading bays